What is the standard procedure of re-painting



#370 : Mumbai - 18 June 2026 at 11:15 am

Putty touch up, followed by a coat of primer and 2 coats of paint application, provided walls are in good condition without any cracks or water seepage. Priming can be skipped if matte finish paint is used. However, it is always advisable to have an under coat of primer if a gloss (sheen) finish is desired or when painting a shade way lighter or darker than existing.

ads
2024 © Gooezy Trends | Feed your Curiosity